TEAM AND SYSTEM PERFORMANCE: A CASE STUDY OF TWO ABC PROJECTS

Authors

  • NUR NAHA ABU MANSOR Faculty of Management and Human Resource Development Universiti Teknologi Malaysia
  • RICHARD PIKE School of Management University of Bradford, UK
  • MIKE TAYLES Hull Business School University of Hull, UK

Abstract

ABSTRACT  
Recent literature has shown a renewed interest in implementation of information system implementation research. Current trends in the organisational deployment of IS tools have motivated new studies of Activity Based Costing (ABC) implementation efforts. This paper reports on two case study investigation of ABC system project. An interview schedule of 13 ABC team members’ and users’ experiences developing ABC systems and user perceptions of ABC performance is highlighted and compared.   
A preliminary case of ABC implementation in the two ABC projects will be discussed. Engineers, accountants, and senior executives were interviewed across the 2 ABC projects in the organisation. Interview instrument, based on previously validated measurement of ABC team and user experience through questionnaires were adapted and validated to suit the interview questions.   
The results revealed that both ABC projects had team members that were highly cohesive in nature, and with very high conflict resolution ability. ABC performance was deemed successful and effective as perceived by their users in areas of cost accuracy and increased dollar improvements. However, these effects were rather minimal and yet to be justified over time. Nevertheless, overall ABC users across the two ABC projects revealed that there were positive impacts of ABC felt by its implementation.    
This paper is intended to share two ABC projects implementation experience in the organisation. It is hoped, to shed light on various team and performance problems that future consideration for ABC innovation.

References

Amason, A. C. and Sapienza, H. J. (1997). The effects of top management team size and interaction norms on cognitive and affective conflict. Journal of Management, 23(4): 495-516.

Anderson, S. W. and Young, S. M. (1999). The impact of contextual and process factors on the evaluation of activity based costing systems. Accounting, Organizations and Society, 24: 525-559.

Anderson, S.W., Hesford, J.W. and Young, S.M. (2002). “Factors Influencing the Performance of Activity-Based Costing Teams: A Field Study of ABC Model Development Time in the Automobile Industry. Accounting, Organizations and Society. 27:195-211.

Bantel, K. A. and Jackson, S. E. (1989). Top management and innovations in banking: does composition of the top teams make a difference? Strategic Management Journal 10: 107-124.

Bhimani, A. (2003). A study of the emergence of management accounting system ethos and its influence on perceived system success. Accounting, Organizations and Society.

Brewer, P. C. (1998). National culture and activity-based costing system: A note. Management Accounting Research 9: 113-260.

Cooper, R., Kaplan, R. S., Maisel, L.S., Morrissey, E. and Oehm, R.M., (1992). Implementing activity-based cost management: Moving from analysis to action, Institute of Management Accountants, Montvale, New Jersey.

Drury, C. and Tayles, M., (2000). Cost system design and profitability analysis in UK companies, Chartered Institute of Management Accountants, London.

Ford, R. C. and Mclaughlin, S. (1992). Successful Project Teams: A Study of MIS Managers. IEEE Transactions on Engineering Management 39(4): 312-317.

Foster, G. and Swenson, D. W., (1997). Measuring the success of activity-based cost management and its determinates. Journal of Management Accounting Research, 9, 104141.

Friedman, A.L. and Lyne, S.R. (1998). Implementing activity-based techniques: A long run study of success and failure. Paper presented at the EIASM workshop on New Directions in management accounting: innovation in practice and research, Brussels, December 10-12.

Guzzo, R. A. and Dickson, M. W. (1996). Teams organisations: recent research on performance and effectiveness. Annual Review of Psychology. Annual Reviews.

Hackman, J. R. and Oldham, G. R. (1980). Work Redesign. Reading, MA, Addison Wesley Publishing Company.

Henderson, J. C. and Lee, S. (1992). Managing IS Design Teams: A Control Theories Perspective. Management Science 38(6).

Hofestede, G. (1980). The Cultural Consequences: International Difference in Work Related Values. London: Sage.

Hunton, J. E. and Gibson, D. (1999). Soliciting user-input during the development of an accounting information system: investigating the efficacy of group discussion. Accounting, Organizations and Society 24: 597-618.

Ingram, H. (1996). Linking Teamwork with Performance. Team Performance Management 2(4): 5.

Ingram, H. and Desombre, T. (1999). Teamwork: Comparing academic and practitioners' perceptions. Team Performance Management 5(1): 16.

Innes, J. and Mitchell, F., (1995). A survey of activity-based costing in the UK’s largest companies. Management Accounting Research, 6(2): 137-153.

Innes, Mitchell, J, F and Sinclair, D. (2000). Activity-based costing in the U.K.'s largest companies: a comparison of 1994 and 1999 survey results. Management Accounting Research Vol. 11: 349-362.

Jackson, S. E., K. L. May, et al. (1995). Understanding the dynamics in decision making teams. In Guzzo R.A. Sales E. (Eds.). Team Effectiveness and Decision Making in Organisations. San-Francisco, Josey-Bass: 204-261.

Jiang, J. J., G. Klein, et al. (2002). The impact of IS department organizational environments upon project team performances. Information and Management 1985(2002): 1-8.

Joshi, P.L. (1998). An Exploratory Study of Activity-Based Costing Practices and Benefits in Large Size Manufacturing Companies in India. Accounting and Business Review. 5(1): 65-93.

Katzenbach, J. R. and Smith, K. (1993). The Wisdom of Teams: Creating the HighPerformance Organization. Boston, Massachusetts, Harvard Business School Press

Kirkman, B. L. and Rosen, B (2000). Powering Up Teams Organizational Dynamics, 4865.

Launonen, M. and Kess, P. (2002). Team roles in business process re-engineering. International Journal of Production Economics 77(2002): 205-218.

Lewin, K. (1943). Psychology and the Process of Group Living. The Journal of Social Psychology , S.P.S.S.I. Bulletin 17: 113-131.

Loch, C.H., Huberman, B.A., and Stout, S. (2000). Status Competition and Performance in Work Groups. Journal of Economics Behaviour and Organization 43: 35-55.

Maznevski, M. L. (1994). Understanding the differences: Performance in decisionmaking groups with diverse members. Human Relations 47: 531-552.

McGowan, A. S. and Klammer, T.P. (1997). Satisfaction with activity-based cost management. Journal of Management Accounting Research, 217-238.

Mohrman, S. (1995). Designing Team Based Organizations: New Forms for Knowledge Work. San Francisco, Jossey-Bass Inc.

Pagell, M. and Lepine, J.A. (2002 (Article in Press)). Multiple case studies of team effectiveness in manufacturing organizations. Journal of Operations Research.

Reilly, R. R., L. S., et al. (2002). The role of personality in new product development team performance. Journal of Engineering and Technology Management 19(1): 39-58.

Shields, M.D. (1995). .An empirical analysis of firms’ implementation experience with activity-based costing. Journal of Management Accounting Research, 7: 148-166.

Shields, M. D. and Young, S. M. (1994). Behavioural and Organisational Issues in B.Brinker (ed.). New York, Warren Graham Lamont.

Swenson, D. (1995). The benefits of activity-based cost management to the manufacturing industry. Journal of Management Accounting Research, 7, Fall, 167-180.

Teo, T. S. H. and Ang, J. S. K. (2001). An examination of major IS planning problems. International Journal of Information Management 21: 457-470.

Thompson, F., Baughan, D. and Motwani, J. (1998). A Case of Innovative Integration of High-Performance Work Teams. Journal of Workplace Learning. 10(3): 157-164.

Tjosvold, D., West, M.A. and Smith, K.G. (2003). Teamwork and Cooperation: Fundamentals of Organisational Effectiveness. International Handbook of Organisational Teamwork and Cooperative Working. John Wiley & Sons Ltd.: 656.

Vadapalli, A. and Mone, M. A. (2000). Information technology project outcomes: user participation structures and the impact of organization behaviour and human resource management issues. Journal of Engineering Technology Management 17: 127-151.

Wang, E. T. G. and Tai, J. C. F. (2002). Factors affecting information systems planning effectiveness: organizational contexts and planning dimensions. Information and Management 1-17.

Watson, W.E., Kumar, K. and Michael, K.L. (1993). Cultural Diversity's Impact on Interaction Process and Performance: Comparing Homogeneous and Diverse Team Task Groups. Academy of Management Journal. 36: 590-602.

Yeh, Q.J. and C.L. Tsai (2001). “Two conflict potentials during IS development.†Information and Management 39: 135-149.

Downloads

Published

2017-04-06

How to Cite

ABU MANSOR, N. N., PIKE, R., & TAYLES, M. (2017). TEAM AND SYSTEM PERFORMANCE: A CASE STUDY OF TWO ABC PROJECTS. Jurnal Kemanusiaan, 4(1). Retrieved from https://jurnalkemanusiaan.utm.my/index.php/kemanusiaan/article/view/151

Issue

Section

Articles